- All products
- Holidays Accrual Advanced
- All products
Advanced Accrual Calculator
Replace the standard accrual engine with a powerful, configurable calculator that supports pro-rata, period-start and period-end methods, with full control of limits and audit trails.
Flexible Day Accumulation
Custom Accrual Methods
Configure the exact behavior your organization requires with 3 methods: Prorate (proportional to days worked), Period Start (full allocation at the beginning) and Period End (upon completion).
Three-Level Limit System
Control accumulation with independent limits for per-period accrual, carryover and absolute total balance, generating automatic loss entries in the history for maximum transparency.
Technical Implementation Guide
5-Step Setup:
- 1. Allocation Type: Go to Time Off > Managers > Allocation and select the Accrual Allocation type.
- 2. Period Definition: Set the number of days per year/month (e.g. 20 days per year).
- 3. Method Selection: Choose between Prorate, Period Start or Period End according to your policy.
- 4. Applying Limits: Optionally enable caps on the total balance or on carryover days.
- 5. Simulation: Use the "Calculate to date" button to project future balances without affecting real data.
Accrual History (Ledger)
Every balance change is recorded with date, amount and reason (gain, loss due to limit or adjustment), ready for audits.
Validation Scenarios (QA)
| Test Scenario | Resultado Esperado | Estado |
|---|---|---|
| Pro-rata Calculation (Prorate) | The balance is calculated on actual days worked, excluding unpaid leave. | |
| Total Balance Limit | If the limit is 10 days, the system blocks accruals above that (e.g. 18 days) and records the loss. | |
| Projection Wizard | When you select a future date, the wizard shows a period-by-period breakdown of the estimated balance. | |
| Time Units (Hours/Days) | Automatic conversion of hours to days using the employee's resource calendar. |
Preguntas Frecuentes
What happens with unjustified absences?
With the Prorate method, unpaid absence days are subtracted from the working days, proportionally reducing the accrued allocation.
Is manual recalculation safe?
Yes. It is idempotent: it recomputes the balance from the start date to today, replacing previous entries to ensure the balance is always correct.
WhatsApp Sales
CHAT +1 828 672 6150ERP Consulting
EMAIL leads@ganemo.comTechnical Support & Help Desk
Need a complex accrual setup to comply with local regulations? Our technical team is ready to configure your allocation rules.
ayuda@ganemo.comAdvanced Accrual Calculator
Replace the standard accrual engine with a powerful, configurable calculator that supports pro-rata, period-start and period-end methods, with full control of limits and audit trails.
Flexible Day Accumulation
Custom Accrual Methods
Configure the exact behavior your organization requires with 3 methods: Prorate (proportional to days worked), Period Start (full allocation at the beginning) and Period End (upon completion).
Three-Level Limit System
Control accumulation with independent limits for per-period accrual, carryover and absolute total balance, generating automatic loss entries in the history for maximum transparency.
Technical Implementation Guide
5-Step Setup:
- 1. Allocation Type: Go to Time Off > Managers > Allocation and select the Accrual Allocation type.
- 2. Period Definition: Set the number of days per year/month (e.g. 20 days per year).
- 3. Method Selection: Choose between Prorate, Period Start or Period End according to your policy.
- 4. Applying Limits: Optionally enable caps on the total balance or on carryover days.
- 5. Simulation: Use the "Calculate to date" button to project future balances without affecting real data.
Accrual History (Ledger)
Every balance change is recorded with date, amount and reason (gain, loss due to limit or adjustment), ready for audits.
Validation Scenarios (QA)
| Test Scenario | Resultado Esperado | Estado |
|---|---|---|
| Pro-rata Calculation (Prorate) | The balance is calculated on actual days worked, excluding unpaid leave. | |
| Total Balance Limit | If the limit is 10 days, the system blocks accruals above that (e.g. 18 days) and records the loss. | |
| Projection Wizard | When you select a future date, the wizard shows a period-by-period breakdown of the estimated balance. | |
| Time Units (Hours/Days) | Automatic conversion of hours to days using the employee's resource calendar. |
Preguntas Frecuentes
What happens with unjustified absences?
With the Prorate method, unpaid absence days are subtracted from the working days, proportionally reducing the accrued allocation.
Is manual recalculation safe?
Yes. It is idempotent: it recomputes the balance from the start date to today, replacing previous entries to ensure the balance is always correct.
WhatsApp Sales
CHAT +1 828 672 6150ERP Consulting
EMAIL leads@ganemo.comTechnical Support & Help Desk
Need a complex accrual setup to comply with local regulations? Our technical team is ready to configure your allocation rules.
ayuda@ganemo.comSpecifications
| Version | 19.0, 20.0 |